Canarm PLF14 User Manual

Browse online or download User Manual for Household fans Canarm PLF14. Canarm PLF14 User manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - User manual and

User manual and installation guide

Page 2 - About the manual

Chapter 2: Installing your SEC-HD Phason 10 One of the most common causes of power surges is lightning. When lightning strikes the ground, it pro

Page 3 - Table of contents

SEC-HD user manual What you need to know before installing your SEC-HD 11  Do not use Snubber filters with variable stages.  Some power cont

Page 4

Chapter 2: Installing your SEC-HD Phason 12 SEC-HD layout Voltage selection switch: set this switch to the correct voltage before installing yo

Page 5 - Introducing the SEC-HD

SEC-HD user manual Connecting equipment to your SEC-HD 13 Mounting your SEC-HD 1. Select a location for your SEC-HD. Make sure you have enough c

Page 6 - Greenhouse applications

Chapter 2: Installing your SEC-HD Phason 14 You can connect your SEC-HD to 120 or 230 VAC, 50 or 60 Hz power. To connect the incoming power sour

Page 7

SEC-HD user manual Connecting equipment to your SEC-HD 15 Connecting variable-stage cooling elements The SEC-HD has two variable-stage cooling

Page 8 - Menu layout

Chapter 2: Installing your SEC-HD Phason 16 Using three-phase power If you are connecting your SEC-HD to a three-phase system, connect the contro

Page 9

SEC-HD user manual Connecting equipment to your SEC-HD 17 To connect single-stage heating or cooling elements Connect single-speed heating or coo

Page 10

Chapter 2: Installing your SEC-HD Phason 18 To connect an alarm system  If you are connecting the alarm system to a network of controls and y

Page 11 -  Coil: 10.2 mA at 240 VAC

SEC-HD user manual Finishing the installation 19 After you have finished connecting all equipment, wiring, and cables to your SEC-HD, it is time

Page 12

Copyright Phason Inc. Printed in Canada All rights reserved. 31048004 About the manual The manual describes the features of your SEC-HD and how to

Page 13

20 Chapter 3: Configuring your SEC-HD Chapter 3 explains how to configure your SEC-HD. Configuring your SEC-HD includes telling it which equipme

Page 14

SEC-HD user manual Configuring the main control functions 21 Configuring the main control functions Before configuring the variable and relay sta

Page 15

Chapter 3: Configuring your SEC-HD Phason 22 To select the operating frequency 1. Press Program until ( 0 N f displays and then press Select. Th

Page 16

SEC-HD user manual Configuring the stages 23 Configuring the stages Your SEC-HD has three types of stages: two variable stages, three relay (ON/O

Page 17 -  COM: common connection

Chapter 3: Configuring your SEC-HD Phason 24 Configuring relay stages, parameters 21 to 23 The SEC-HD has three relay stages you can configure as

Page 18

SEC-HD user manual Testing the configuration 25 Testing the configuration After configuring all the control elements (variable stages, relays, an

Page 19 - Programming

Chapter 4: Programming your SEC-HD Phason 26 Chapter 4: Programming your SEC-HD What you need to know before programming Programming the SEC-HD b

Page 20

SEC-HD user manual What you need to know before programming 27

Page 21 -  Hysteresis

Chapter 4: Programming your SEC-HD Phason 28 Stage 2 idle range is the temperature above which the stage 2 fan operates at Stage 2 idle speed.

Page 22

SEC-HD user manual Programming the parameters 29 Programming the parameters Programming the parameters explains parameters 1 to 23 and how to pro

Page 23 - Configuring the stages

iii Table of contents Chapter 1: Introducing the SEC-HD ... 5 Intro

Page 24

Chapter 4: Programming your SEC-HD Phason 30 Programming variable stages, parameters 2 to 9 There are four settings to program for each variable

Page 25 - Testing the configuration

SEC-HD user manual Programming the parameters 31  If you need to connect more cooling elements than you have relays available, and you are not

Page 26 -  You have

Chapter 4: Programming your SEC-HD Phason 32 How proportional control works (stage 5 only) Proportional heating When configured for proportional

Page 27

SEC-HD user manual Programming the parameters 33 Proportional cooling When configured for proportional cooling, the relay controls a water pump

Page 28

Chapter 4: Programming your SEC-HD Phason 34 To program proportional band settings The examples in the following procedure use program A. Progra

Page 29 - Programming the parameters

SEC-HD user manual Programming the parameters 35 Programming alarm settings, parameters 15 and 16 There are four alarms. For a more-detailed desc

Page 30

Chapter 4: Programming your SEC-HD Phason 36 1. Press Program until the program you want to adjust displays, for example A pr for program A. 2.

Page 31 -  Program A displays as

SEC-HD user manual Programming the parameters 37 5. To enable or disable the Power fail alarm, press Up or Down until 33 displays and then press

Page 32

38 Chapter 5: Monitoring and maintaining your SEC-HD Chapter 5 explains how to monitor the SEC-HD after you have installed, configured, and prog

Page 33

SEC-HD user manual Monitoring your SEC-HD 39 Selecting the operating program The SEC-HD has four configurable programs, A, B, C, D, E, F, and G i

Page 34

iv Acknowledging alarms ... 3

Page 35

Chapter 5: Monitoring and maintaining your SEC-HD Phason 40 To acknowledge alarms Press Select. If there was only one alarm message, the SEC-HD c

Page 36

SEC-HD user manual Testing settings and equipment 41 To use stage override mode 1. Press Program until t e s t displays and then press Select. T

Page 37

Chapter 5: Monitoring and maintaining your SEC-HD Phason 42 To use temperature override mode 1. Press Program until t e s t displays and then pr

Page 38 - Monitoring your SEC-HD

SEC-HD user manual Servicing and maintaining your SEC-HD 43 DO NOT use the disable ventilation function to shut down fans while working on wirin

Page 39

Chapter 5: Monitoring and maintaining your SEC-HD Phason 44 Saving and restoring settings The SEC-HD Saver is an innovative and easy-to-use produ

Page 40

SEC-HD user manual Servicing and maintaining your SEC-HD 45 6. To return to the Configuration menu, press Back once. To return to the Main menu, p

Page 41

Chapter 5: Monitoring and maintaining your SEC-HD Phason 46 The inside of the SEC-HD cover is where you connect the SEC-HD Updater. The cover la

Page 42

SEC-HD user manual Servicing and maintaining your SEC-HD 47 Replacement kits and optional accessories Parts and kits Display kit, model K310056 S

Page 43

Chapter 5: Monitoring and maintaining your SEC-HD Phason 48 Power contactors Phason’s 240-volt power contactors are heavy-duty relays that increa

Page 44

49 Appendixes This section contains reference information that is useful when installing, configuring, setting up, or troubleshooting your SEC-H

Page 45

5 Chapter 1: Introducing the SEC-HD Chapter 1 introduces you to the Staged Environment Control (SEC-HD). Read chapter 1 before reading the rest

Page 46

Appendixes Phason 50 idle range The temperature setting below which a variable stage's fan is off and the inlet is closed. When the temperat

Page 47

SEC-HD user manual Appendix B: Troubleshooting 51 Alarm and error messages The following table lists the alarm and error messages, the possible c

Page 48

Appendixes Phason 52 Troubleshooting The following table lists some problems, possible causes, and possible solutions. If you are having a proble

Page 49 - Appendixes

SEC-HD user manual Appendix B: Troubleshooting 53 Variable fan not running Incorrect wiring  Correct the wiring. For more information, read Conn

Page 50 - Appendix B: Troubleshooting

Appendixes Phason 54 Appendix C: Factory defaults When your SEC-HD leaves the factory, it comes with default settings and configuration. Configur

Page 51

SEC-HD user manual Appendix D: Installation worksheet 55 Appendix D: Installation worksheet Use the following worksheet to list all the equipment

Page 52

Appendixes Phason 56 Appendix E: Configuration worksheets Use the Installation Worksheet on page 55 when completing the configuration worksheets

Page 53

SEC-HD user manual Appendix F: Settings worksheets 57 Relay configuration worksheet For each stage, enter a description (for reference only) and

Page 54 - Appendix C: Factory defaults

Appendixes Phason 58 Relay stages worksheet Parameter Setting Range/options Stage 3 set point -13.0 to 125 °F (-25 to 51.7°C) Stage 4 set poin

Page 55

SEC-HD user manual Appendix G: Motor curves 59 Appendix G: Motor curves Motor curves provide a way to proportionally increase or decrease speed,

Page 56

Chapter 1: Introducing the SEC-HD Phason 6 Greenhouse applications Greenhouse applications include controlling ceiling louvers, variable and sing

Page 57

Appendixes Phason 60 Manufacturer Diameter (inches) Model Specifications Recommended curve 24 0.63 HP, 1700 RPM 2 Franklin 10 1/6 HP, 3450

Page 58

SEC-HD user manual 61 Index A acknowledging alarms ... 35–36 active program ...

Page 59 - Appendix G: Motor curves

Index Phason 62 operating program ... 35 P parameters ... 22–24, See also programming or configur

Page 60 - Appendixes Phason

Limited warranty This warranty applies only to the Phason Staged Environment Control (SEC-HD). If you need warranty service, return the product a

Page 61 - SEC-HD user manual

Service and technical support Phason will be happy to answer all technical questions that will help you use your SEC-HD. Before contacting Phason, c

Page 62 - Index Phason

SEC-HD user manual Becoming familiar with the SEC-HD 7 Becoming familiar with the SEC-HD The four-character LED display shows temperatures, alarm

Page 63 - Limited warranty

Chapter 1: Introducing the SEC-HD Phason 8 Menu layout

Page 64

9 Chapter 2: Installing your SEC-HD Chapter 2 explains how to mount, install, and connect equipment to your SEC-HD. Topics in chapter 2 include:

Comments to this Manuals

No comments